Aermec Blog

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Tags
    Tags Displays a list of tags that have been used in the blog.
  • Bloggers
    Bloggers Search for your favorite blogger from this site.
  • Team Blogs
    Team Blogs Find your favorite team blogs here.
  • Login
    Login Login form

Denver Water Operations Complex Redevelopment. NRK Wins!

Posted by on in Aermec North America
  • Font size: Larger Smaller
  • Hits: 333
  • 0 Comments
  • Subscribe to this entry
  • Print

Aermec NRK air to water heat pumps were installed in the Denver Water Operations Complex Redevelopment. The units were selected for their extreme efficiency and ability to provide 149°F water along with heating mode operation as low as -4°F. The units also provide chilled water and heat recovery.

 

The Aermec NRK units are reversible heat pumps that are optimized for heating. They are designed for the production of chilled and heated water in residential and commercial buildings. The units were integral to the design strategy as they replaced inefficient machines that could not keep up with the increasing demand of the complex Redevelopment. The Aermec units are also environmentally friendly as they do not use fossil fuels.

 

Below are details about the project square footage. Also, provided are pictures from the job site! Click here for more information about the project.

 

Project Facts

Warehouse: 29,000 sq. ft.

Trade Shop and Central Plant: 41,000 sq.ft.

Administration Building: 187,000 sq.ft.

Wellness Center: 8,000 sq.ft.

Meter Shop: 16,000 sq.ft.

Fleet Building: 28,000 sq.ft.

Wash Station: 7,000 sq. ft.

 

 

0

Comments

  • No comments made yet. Be the first to submit a comment

Leave your comment

Guest
Guest Thursday, 27 July 2017